Stainless structure ...

Demiurge is moving along with the stainless steel structure, probably another month to go ...



White concrete !

Sam's team at Neeser Construction managed to get the base curve of the Alaska commission poured out of white concrete. It is some weird stuff, there is no pigment no paint no nothing !







Wednesday, September 14, 2011

Alaska progress ...





Alaska project is moving along as planned. The rolled tubes arrived in Demiurge for fabrication. For the base curve, a white concrete pour is scheduled to be done when weather permitting on site.